Retro — Bahala Subtypes + Rename
~GO chain complete: ~P ~E ~B ~T ~S ~R
Chain Summary
| Step | Command | Result |
|---|---|---|
| Plan | ~P | Bahala subtypes plan — 4 changes, mirror structure |
| Estimate | ~E | Board 18 — 5 items, 13 pts |
| Build | ~B | All 5 items built in one pass |
| Test | ~T | 8/8 checks pass, no fixes needed |
| Ship | ~S | Live on bahalaka.com via wrangler |
| Retro | ~R | This report |
Stats
| Commits | 8 (plan edits + estimate + build + test + ship + retro) |
| Points shipped | 13 |
| Test/fix loops | 0 (clean first pass) |
| Merge conflicts resolved | 1 (remote had ~i + ~ul while plan was being written) |
What Went Well
- Clean first pass — no ~F needed. Build was straightforward content changes.
- Plan review with Joey caught the "producer" line early — removed before build.
- Bahala Ako 7.1 rewritten to Joey's exact words before build started.
- Rename was surgical — 14 display text changes, zero code breakage.
What Could Be Better
- Merge conflict from concurrent sessions — expected but adds friction. Consider working in branches for plan-only commits.
- Telemetry HTML viewer still uses a single inlined JSON line — hard to diff. Could split into separate data file.
What's Next
Board 18 is done. Boards 5–17 (app buildout, 208 pts) remain ready when Joey wants to start the WASM/SDK work.